The CAIMA New Power Plant, concerns the installation of a New Natural Gas Steam Boiler, with a capacity of 80 Ton/h of superheated steam; the installation of a 9MWe back pressure steam turbine and the turbine bypass steam pressure reduction systems.
Activities: TEE was in charge of the complete Engineering Services, both Basic and Detailed, Technical Procurement and Commissioning Services. The contract included the design of the electrical systems; all the auxiliary systems as well as the civil works design.
Client: Caima
Location: Portugal
Category: Industry