Galp Energia

  • Galp Energia
  • Galp Energia
  • Galp Energia
  • Galp Energia
  • Galp Energia
  • Galp Energia
  • Galp Energia
  • Galp Energia
  • Galp Energia
  • Galp Energia

EPCM UCO STRIPPER

Galp Energia awarded to TEE the EPCM UCO (Unconverted Oil) Stripper. With this modification, Galp Energia intends to reduce the UCO bleed flow controlling the level of heavy aromatics.

In parallel, it was also possible to improve the global conversion of the unit and the life cycle of the reactor HC-R-02.

The facility includes the following installations and/or equipment:

• New Column
• 2 new centrifugal pumps
• 1 Heat Exchanger
• New Instrumentation and Control System
• Piping and civil works
• E&I works

TEE’s scope includes the execution of all the detailed engineering, procurement/expediting and construction management and works supervision.

Client: Galp Energia

Location: Refinaria de Sines

Category:

Share:

0 comments

Write a comment

Leave a Reply

Your email address will not be published. Required fields are marked *